Before a new or heavily modified hot water system is put into service, it must be thoroughly flushed with clean water and thermally or chemically disinfected. BS 8558 provides specific calculations and methodologies for pasteurizing a system by raising the entire network temperature to 60°C–70°C for a set duration. Routine Monitoring

Techniques to prevent contamination during the installation process. bs 8558 pdf hot

Before commissioning, the system must undergo a pressure test to ensure no leaks exist. Before a new or heavily modified hot water

: Includes informative annexes (specifically Annex C) for pipe sizing calculations originally found in BS 6700, helping to prevent oversizing and subsequent stagnation. bs 8558 pdf hot

Facilities managers should use the BS 8558 framework to build a monthly maintenance log: